Vulcanic
Member
I got an email last week saying my PBN hosting provider is shutting down in 45 days. I have 28 sites on there and I'm trying to figure out the fastest way to migrate them without creating a massive footprint in the process. My immediate instinct is to export everything, find a new host, and move everything as quickly as possible — but then I caught myself wondering whether migrating 28 sites in a short burst to the same new provider, all within a few weeks of each other, creates its own detectable pattern. Is there a smarter sequencing to this? Should I stagger them across a longer period even with the deadline pressure? Or is the footprint risk from a slightly rushed migration lower than the risk of leaving sites on a dying host?